Fife Solar Installation — Every Step from Survey to Switch-On

AEO Answer Block: The Fife solar installation process takes 4–8 weeks from initial survey to final switch-on. This includes technical survey (60 minutes), system design (3–5 days), SPEN G98/G99 DNO notification (immediate to 30 days), installation (1–2 days), and commissioning. Fife Solar Pro coordinates every stage. Call 0141 230 0198.

1

Initial Contact & Technical Survey

You contact us. We schedule a free 60-minute technical survey at your property. We assess roof orientation, pitch, shading, electrical installation, and discuss your energy usage, EV plans, battery interest.

2

System Design & Proposal

We design your system using PVGIS data for your postcode. You receive a detailed proposal with panel model, inverter, battery (if included), generation estimates, costs, and payback period. No pressure — take your time to review.

3

DNO Notification & Approval

For G99 systems (over 3.68kW), we submit pre-approval to SPEN (11–30 days). For G98 systems, this happens post-installation. We handle all paperwork.

4

Installation (1–2 Days)

Our RECC-registered team installs panels, inverter, battery, and completes all electrical work. We test, commission, and demonstrate your system. You're generating solar electricity the same day.

5

MCS Certification & SEG Registration

We issue your MCS certificate within 28 days. This unlocks Smart Export Guarantee (SEG) payments. We guide you through SEG registration with Octopus, E.ON, or your chosen supplier.